COOL HANDLING PLANT EXPANSION CHP-1 PT. BERAU COAL

Coal Handling Plant (EPC Contract):
– Pilling Work, (We prepare the Surveying and marking before the piling team execute. We work with the Experiences Piling Company as a subcontractor)
– (Earth work is exculed)
– Concrete Foundation : Hopper, Transfer conveyor, Stacking, etc.
– Fabrication / Erection all steel structure, hopper, trestle, gallery, chute, walkway and handrail.
– Equipment installation : Feeder Breaker, Secondary Crusher, Reclaimer Feeder, Drive motor, Conveyor equipment,
Metal detector, Magnetic separator
– Electric Work : MCC Building with all panel, Fire protection All Lighting, Safety Device
– HDPE/ Steel Pipe Fabrication and installation, Water Pumping, and Fire
water System and Spraying System
– HDPE Pre Commissioning & HotCommissioning